3. Installation
WARNING: Exposure to Radio Frequency Radiation
The radiated output power of this device is below those
levels considered safe by European exposure limits.
Nevertheless, when fitting the product place it in such a
manner as to minimise the potential for human contact
during normal operation. To minimise exposure, users
should be more than 200 mm from the device during
normal operation
Tools Required
790r signal strength meter and 734r test transmitter.
Flat screwdriver (small).
Philips screwdriver.
Drill.
5mm drill bit.
M5 36mm (four off) and 25mm screws (three off).
Wallplugs, filler.
Preparation
Before installation you should carry out a survey of the
site. You need to know how many and what kind of
detectors will be transmitting to the control unit. You also
need to assess where the control unit must be placed in
order to receive signals from the detectors successfully.
To do this you should conduct signal strength tests.
Cooper Security produce the Scantronic 790r hand held
signal strength meter for this purpose. Alternatively, you
can power the control unit from a battery and use its
built-in testing facility to measure the signal strength
from a detector that you temporarily place at each
planned location.
Siting the Unit
Do site the unit:
Upright (battery at the bottom).
Within a protected zone.