Cooper Security M2000 Guide de l'utilisateur Page 166

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 180
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 165
Text Keys Engineering Manual
158
2. Program “Test Call Int” (Test Call Interval, in Engineers menu 1-5-2-24) as 024 (or a period
of your choice), the internal comms will now make a test call to the ARC 24 hours after the
last signal of any type was sent
Note: To disable Dynamic Test call, leave as “Test Call Strt” “000” (Default) and leave “Test
Call Int” as 000 (default).
OR: -
Static Test call
Static test call will make a test call to the ARC at a programmable time interval e.g. every ten
hours.
Example of programming:-
1. Program “Test Call Strt” (Test Call Start, in Engineers menu 1-5-2-23) as 003, this will make
the first test call at 03:00 (or 3am).
2. Program “Test Call Int” (Test Call Interval, in Engineers menu 1-5-2-24) as 010 (or a period
of your choice), the internal comms will now make a test call to the ARC every ten hours
i.e. the first call will be a 03:00 the next call will be at 13:00 and then at 23:00, 09:00 19:00
and so on.
Note: To disable Static Test call, leave as “Test Call Strt” “000” (Default) and leave “Test Call
Int” as 000 (default).
Vue de la page 165
1 2 ... 161 162 163 164 165 166 167 168 169 170 171 ... 179 180

Commentaires sur ces manuels

Pas de commentaire